1 — You send it
An address and two sentences
Street address, what you think you might do with it, and whether you own it yet. That is enough to start. If you have a rent roll, a survey or an inspection, send those too and the answer gets sharper.
No cost · no obligation · answer inside two weeks
Architecture, engineering, incentives, construction pricing and development economics, pointed at one question: does this building deserve your capital? We will tell you either way, and roughly a third of the time the answer is no.
Not a proposal, not a capabilities deck, not a meeting to schedule another meeting. A straight read on whether the building is worth your capital. It costs nothing and it does not obligate you to hire us.
An address and two sentences
Street address, what you think you might do with it, and whether you own it yet. That is enough to start. If you have a rent roll, a survey or an inspection, send those too and the answer gets sharper.
Usually within a week
A principal and someone from construction, in the building, with a flashlight. Not an intern with a camera. What a building is hiding shows up in the basement and the roof, not in the listing photographs.
Our estimators, not an average
Order-of-magnitude construction cost from the people who build these, against the scope the building actually needs. Square-foot averages are wrong in both directions on a hundred-year-old structure.
Federal, state, local
Historic eligibility, what the credit is worth in that state, and which other programs stack — New Markets, Opportunity Zone, housing credits, PACE, abatement, TIF. Including which two of them cannot coexist.
Inside two weeks
Highest and best use, a program that fits the structure, a cost range, the credit stack, and the fatal flaws if there are any. Enough to take to a lender or to walk away from.
All three are real answers
Roughly a third of the time we tell people not to buy it. That is the answer that saves the most money, and it is the reason the first one is free.


The things that decide a deal, in roughly the order they kill one.
Can it hold the program
Bay spacing, floor-to-floor, window-to-core depth, and load capacity. This sets unit count or key count before any pro forma does.
Listed, contributing, eligible
Whether credits are available at all, and what designation would take if it is missing. Buildings that look too far gone often qualify. Buildings that look pristine sometimes do not.
The seven-figure surprises
Egress, sprinklers, accessibility, fire separation. This is where budgets move after closing, which is the worst time to find out.
Usually the real number
An office building has a few wet stacks. An apartment building needs one per unit line. Where those can land is frequently the number that decides it.
What it earns
Every credit and incentive the building and the location qualify for, priced at what they actually sell for rather than face value.
Rents, keys, absorption
What the finished thing supports, and whether the neighborhood is moving toward you or away from you.
That is the whole offer. No cost, no obligation, no pitch deck.
We walk it, and inside two weeks you get what it wants to be, what that runs, and which credits it earns. If it doesn’t pencil, we say so — that answer is worth the two weeks by itself.
EXACT Architects
3901 Main Street, Suite 201
Kansas City, Missouri 64111
816.200.0340
office@exactarchitects.com